Workplacer.AI
CapabilitiesUse CasesCase StudiesInsightsPlan your dataFree Audit
Book a demo
Capabilities

How Workplacer works — one chain at a time.

Each page follows one job through every Workplacer step it takes: what you bring, what each tool does with it, and what you get out. Pick the one you are facing.

Know

What you have, what it costs and how it is used — kept current without anyone re-keying it.

Know

Occupancy

How is the space really used — and how much should we plan for?

  1. Surveys
  2. Presence connectors
  3. Presence & occupancy
  4. Work model
  5. Office activity profile
  6. Dimensioning
The weekday shapeExample
38 %Mon
71 %Tue
78 %Wed
69 %Thu
31 %Fri

Occupancy over 13 weeks: average 57 %, P85 74 %, peak 78 %. Forecast accuracy ±8 %.

See every step →
Know

Sustainability

What does the estate use and emit — and what is it exposed to?

  1. Energy audit
  2. EPC compliance
  3. Carbon footprint
  4. Scope 3 estimation
  5. Climate risk
  6. CSRD readiness
Emissions in operation, tCO2eExample
Estimated from energy, refrigerants, commuting, waste and water
  • Scope 1 35
  • Scope 2 230
  • Scope 3 (operational) 410
675tCO2e a year
32kg per sqm
14sites
See every step →
Keep control

Every date, duty and decision with a name on it, before it becomes a surprise.

Keep control

Lease events

What have we signed, when must we decide — and what is each choice worth?

  1. Contract reading
  2. Critical dates
  3. Lease Expiry Planner
  4. Break Clause Analysis
  5. Cost of Exit
  6. Stay or Go
  7. Decision register
The year aheadExample
ONDJFMAMJJAS
Today
Rent reviewCPI
DecideBreak or stay
Serve notice31 Mar
Break date30 Sep

Notice is due six months before the break; after 31 Mar 2027 the break can no longer be used.

See every step →
Keep control

Costs

What does the estate cost — and were we billed what the contracts say?

  1. Invoice intake
  2. Reconciliation
  3. Numbers
  4. IFRS 16
  5. Benchmarks
  6. Quarter close & board pack
Billed against the contractExample
InvoiceExpectedBilledVariance
Rent, Sep790 000812 400+2.8 %
Service charge64 00081 900+28.0 %
Parking12 00012 0000.0 %

Tolerance ±10 %: the service charge is SEK 17 900 above its contract — to dispute.

See every step →
Keep control

Assets & operations

What do we have, what state is it in — and what does it cost to run?

  1. Asset register
  2. Stocktakes & inspections
  3. Condition assessment
  4. Asset lifecycle planner
  5. FM cost intelligence
  6. FM service quality
Replacements by year, SEK mExample
1.42026
3.22027
2.42028
1.62029
1.92030

SEK 18.5 m over ten years; 2027 and 2028 exceed a SEK 2 m budget.

See every step →
Improve

Changes to the estate, run from idea to proven result — with the tools to size, find and fit the space.

Improve

Portfolio strategy

What should the portfolio look like in three years — and is the plan delivering?

  1. Portfolio strategy
  2. Headcount growth plan
  3. Portfolio scenarios
  4. Business case
  5. Initiatives
Consolidate two, against todayExample
MeasureTodayConsolidate two
Run rate, SEK a year24.0 m21.1 m
Area, sqm21 00018 400
Locked share78 %61 %
One-offs, SEK—2.2 m

Break Malmö 2, let Uppsala expire. Every contract costed month by month for ten years.

See every step →
Improve

Finding space

Where should we be — and which space, on which terms?

  1. Location strategy
  2. Commute analysis
  3. Space search
  4. Technical requirements
  5. Request (RFP)
  6. Negotiation & signing
Answers, scoredExample
ResponseSEK / sqmScore
Option A — Norrmalm4 40084
Option B — Hagastaden4 05077
Option C — Solna3 60069

4 landlords invited by personal link, 3 answered on the form.

See every step →
Improve

Space planning

How much space do we need — and which building, floor and brief deliver it?

  1. Space Estimate
  2. Space Program
  3. Test Fit
  4. Stack Plan
  5. Fit-out Brief
  6. Layout Review
What 1 032 sqm is made ofExample
150 people × 70 % = 105 office FTE
  • Work settings 620
  • Support 174
  • Circulation 238
112desk seats
48meeting seats
20other seats
See every step →
Improve

Moves

Will everything be ready when people walk in on Monday?

  1. Stakeholder map
  2. Risk register
  3. Programme schedule
  4. Change management
  5. Handover & snagging
  6. Move planner
  7. Day One readiness
Day One, two weeks outExample
71 %ready — 24 of 34 tasks green
IT8/10
Security4/5
FM5/6
Health & safety1/3
  • P1Access cards not yet issued for 40 people
  • P2Ventilation commissioning on floor 6
  • P3Evacuation drill not booked
See every step →
The full picture

Read the Workplacer product story

What Workplacer is, the value it creates, and how the platform fits together — in brief or in full. Read it online or download the PDFs.

Download the product story →

Not sure where to start?

Tell us the decision in front of you — a lease event, a move, a cost question — and we will walk you through the chain on your own portfolio.

Talk to us →How it fits together